Testing Calendar

Posted
October 11, 2022

Case Study: Gas N Wash

Learn how WT Group helped Gas N Wash through a number of challenges, while streamlining new site development.
Posted
October 3, 2022

Retail Group Launches New C-Store Concept

WT Group was proud to provide the Architecture, MEP, and Structural Engineering for the newly launched “Kudos" C-Store concept.
Posted
September 7, 2022

Adhering to Health and Building Codes

Following health and building codes when constructing and operating water facilities is imperative to ensure they are functional, aesthetically pleasing, and safe.
Posted
September 6, 2022

5 Things to Consider When Building An Aquatic Facility

When designing and constructing a swimming pool, swim school, aquatic park, or water feature, there are many factors to evaluate.